Start a project
Services

Four disciplines. One team. No handoffs.

Electronics, firmware, mechanical integration and the software a connected product ships with are decided together, so the trade-offs between them are made deliberately rather than discovered at integration.

Six stages, each with a named deliverable.

01

Scope

Requirements

02

Architect

Block diagram

03

Design

Schematics, layout

04

Prototype

Built boards

05

Validate

Test report

06

Transfer

Production pack